GOVERNMENT SCHEME

PM Kusum Solar Pump Subsidy in Odisha

Most Odisha farmers end up paying only 10 percent of the solar pump cost, sometimes even less under Soura Jalanidhi Yojana, with the rest covered by central subsidy, state subsidy, and an optional bank loan.

Get Free Site Assessment
Call +91 93372 56398
3HP - 10HP
Pump Range
Up to 90%
Subsidy (Soura Jalanidhi)
10%
Farmer Contribution
What Is It

What Is PM Kusum Component B

PM Kusum Component B is a central government scheme that helps farmers replace diesel irrigation pumps with solar powered pumps. It does not need a grid connection, which makes it especially useful for farmland in remote areas. The scheme is run by MNRE and implemented in Odisha through OREDA.

Subsidy Breakdown

How the Subsidy Is Split

Central Subsidy (CFA)30%
Odisha State SubsidyAt least 30%
Farmer Share10% upfront + up to 30% loan (optional)
Odisha Benefit

Odisha's Extra Benefit: Soura Jalanidhi Yojana

Odisha runs its own additional scheme, Soura Jalanidhi Yojana, which can push the total subsidy up to 90 percent for small and marginal farmers, on top of the national PM Kusum baseline.

Sizing

Which Pump Size Do You Need

Solar pumps under this scheme range from 3HP to 10HP. Most farms in Odisha fall in the 3HP to 7.5HP bracket, depending on land size and how deep the water source sits. We assess your land and water source before recommending the right capacity.

Documents

Documents Needed

Land ownership papers such as RoR or Patta, your Aadhaar card, a bank passbook, and details of your water source. We help you organize everything before submission.

Process

How To Apply

1
Register
Register on the OREDA portal, or we do this for you.
2
Site Verification
OREDA or DISCOM officials verify your land and water source.
3
Contribution & Vendor
Deposit your share and select an empanelled vendor like us.
4
Installation
Your solar pump is installed by our trained team.
5
Inspection
The system is inspected and commissioned.
6
Subsidy Processed
Your subsidy share is processed through the scheme.
Avoid Rejections

Common Reasons Applications Get Rejected

Most rejections come down to incorrect or incomplete land documents, an unverified water source, or using a vendor that is not empanelled under the scheme. We check all of this before your application is submitted, so these issues do not come up later.

Real Project

A Real Solar Pump Project

Solar water pump installation at Khaliapali village, Boudh district, Odisha
GREEN FILAMENT PROJECT
Solar Water Pump, Khaliapali, Boudh District

A ground-mounted solar water pump installed at Khaliapali village in Boudh district under the government solar irrigation scheme. The system now gives the farmer reliable water access without depending on diesel or grid electricity.

FAQ

Frequently Asked Questions

OFFICIAL SOURCES

All scheme and subsidy information on this page is based on publicly available data at the time of publishing. Green Filament does not guarantee the accuracy or current validity of any government scheme details. Subsidy amounts, eligibility criteria and scheme availability are subject to change at the discretion of Central or State Government authorities. We strongly recommend verifying details from official government portals before applying.

Ready to Apply for PM Kusum?

Free site assessment. We handle the entire application on your behalf.

Connect With Us
WhatsApp Us